Construction started
2017; 9 years ago (2017)
Completed
2025; 1 year ago (2025)
Cost£85 million[1]
OwnerLegacie Developments
Height
HeightNorth Tower: 107 m (349 ft)
South Tower: 50 m (163 ft)
Technical details
Floor countNorth Tower: 35
South Tower: 16
Design and construction
ArchitectJeffrey Bell Architects / Falconer Chester Hall[2]
Other information
Number of units300
Website
embankmentexchange.co.uk

Embankment Exchange is a residential development in the Greengate area of Salford, England. It comprises 300 apartments across two buildings connected by a central podium: the 107-metre (349 ft) North Tower and 50 m (163 ft) South Tower.[2] The buildings were designed by Jeffrey Bell Architects,[3] and constructed between 2017 and 2025, with the schedule prolonged by several delays.

As of September 2026, the North Tower is the fifth-tallest building in Salford and the 26th-tallest in Greater Manchester.

History

[edit]

Planning

[edit]

The planning application was submitted to Salford City Council in August 2015,[4] and planning approval was granted in March 2016.[5]

Construction

[edit]

In 2017 Elliot Group commenced construction of the complex, then called The Residence,[2] but progress was delayed the following year when main contractor Forrest went into administration.[6] Work stalled again in 2020 pending the outcome of a wider fraud investigation,[6] before restarting in February 2022 following the acquisition of the site by Legacie Developments, which renamed the project Embankment Exchange.[7] Construction was initially expected to complete in 2023,[2] and in October 2024 it was announced that completion was due by the end of the year.[8] The buildings were completed in 2025.[2]

Facilities

[edit]

The development includes a spa, a gym, a residents' lounge and a 24-hour concierge.[9]

[edit]

See also

[edit]

References

[edit]
  1. ↑ Jackson, Nick (27 October 2022). "Flagship £40m, 300-home tower block boasting spa and gym to soon dominate Salford's skyline". Manchester Evening News. Archived from the original on 31 July 2023. Retrieved 31 July 2023.
  2. 1 2 3 4 5 "Embankment Exchange". Council on Tall Buildings and Urban Habitat. Archived from the original on 21 March 2025. Retrieved 6 September 2025.
  3. ↑ Whelan, Dan (27 October 2022). "Legacie secures £40m for long-stalled Salford project". placenorthwest.co.uk. Archived from the original on 31 July 2023. Retrieved 31 July 2023.
  4. ↑ "Planning – Application Summary". Salford City Council. Retrieved 31 July 2023.
  5. ↑ "Application No: 17/69573/FUL" (PDF). Salford City Council. Archived (PDF) from the original on 31 July 2023. Retrieved 31 July 2023.
  6. 1 2 Middleton-Pugh, Jessica (20 February 2020). "Work stops on Elliot's £70m Salford tower". placenorthwest.co.uk. Archived from the original on 31 July 2023. Retrieved 31 July 2023.
  7. ↑ Whelan, Dan (4 February 2022). "Funding deal paves the way for Legacie to restart Salford tower". placenorthwest.co.uk. Archived from the original on 31 July 2023. Retrieved 31 July 2023.
  8. ↑ Hatmaker, Julia (28 October 2024). "Nexus, Legacie pick up stalled £45m Salford resi". placenorthwest.co.uk. Archived from the original on 14 November 2024. Retrieved 17 January 2025.
  9. ↑ Butler, Ben (28 October 2022). "Developer Strikes Funding Deal for Apartments Tower". insidermedia.com. Archived from the original on 31 July 2023. Retrieved 31 July 2023.